Want to be in the loop?
subscribe to
our notification
Business News
PM ORDERS SWIFT RESOLUTION OF CHALLENGES FOR RENEWABLE ENERGY PROJECTS
Prime Minister Phạm Minh Chính has laid stress on the need to complete the resolution of obstacles for renewable projects by February 2025 to prevent wastefulness, contributing to ensuring electricity for development.
Chairing a hybrid conference on announcing and implementing the Government’s resolution on removing bottlenecks for the projects on December 12, the PM underscored that to achieve the country's targeted 8 per cent economic growth in 2025, position itself for potential double-digit growth in 2026-30, and enter a new era – the era of the nation’s rise, Việt Nam must capitalise on all resources, including renewable energy infrastructure.
He called on the energy sector’s growth to outpace GPD expansion by at least 1.5 times, meaning it should document an annual 12 per cent rise.
With investments in renewable energy projects totalling more than VND308 trillion (US$13 billion), delays in putting projects into operation waste immense social resources, he said, stressing while past implementation errors must be handled, it is a must to facilitate project continuation.
Criminal prosecution, he stressed, should be the last resort, applicable in cases that cause serious consequences those of corruption, adding substantive and economic solutions that respect legal regulations should take precedence to ensure sound investment climate, security-order, national energy security and the harmony of interests between the State and investors.
For projects overlapping with defence or mineral planning, competent sides must make cost-benefit analyses and guide adjustments to ensure alignment with national priorities.
Regarding projects enjoying the preferential Feed-in Tariff (FIT) schemes that have been found in violations due to failure to meet eligibility criteria, the preferential rates will be revoked. Instead, electricity purchase prices must be recalculated in accordance with regulations, he said.
The PM asked ministries, sectors and localities to take responsibility and immediate action to clear all hurdles for renewable energy projects, underlining the need for transparency and accountability at every level of governance. He also warned against corruption as well as vested group/personal interests during the process.
According to the Ministry of Industry and Trade, by the end of 2023, renewable sources, including wind and solar, represented 21,664 megawatts, constituting about 27 per cent of the national power system. Cumulative electricity generation has reached 27,317 million kilowatt-hours, accounting for 12.75 per cent of the total system output.
These achievements align with Việt Nam's strategic energy planning, notably the National Power Development Plan VIII and the national commitment to achieve net-zero emissions by 2050.
Source: VIR
Related News
REMITTANCES TO HCM CITY RISE NEARLY 40% IN Q3
Remittances to HCM City reached more than US$2.83 billion in the third quarter of this year, up 39.5 per cent from the previous quarter and 3.6 per cent year-on-year. This was the first quarter showing positive annual growth this year, helping narrow the decline in remittance inflows over the first nine months. According to the State Bank of Vietnam (SBV)’s Regional Branch 2, remittances transferred to HCM City through credit institutions and economic organisations totalled $2.835 billion in Q3, an increase of more than $802 million from the previous quarter.
TECH SECTOR GROWTH OPENS UP OPPORTUNITIES FOR VIỆT NAM TO GO GLOBAL
The growth of the electronics, semiconductor and high-tech sectors worldwide is opening up a variety of opportunities for Vietnamese enterprises to integrate more deeply into the global supply chain. However, to become suppliers for these corporations, domestic enterprises must meet rigorous standards regarding quality, technology, productivity and order fulfilment capabilities.
FOREIGN INVESTORS SEEKING A SYNCHRONISED MANUFACTURING ECOSYSTEM
Instead of focusing only on land costs and incentives as usual, foreign investors are seeking a synchronised manufacturing ecosystem, from stable power supply and logistics to shared infrastructure and the convenience of completing residence procedures for experts to serve their long-term investment in the country.
SENTRYSAFE FHW40200 – PROTECT YOUR VALUABLES, ENJOY PEACE OF MIND!
Looking for a reliable solution to protect your important documents, cash, and valuables from fire and water damage? Genuine SENTRYSAFE - Reliable protection for your valuables and peace of mind! Contact Sen Wai Vietnam for more information and personalized product recommendations.
HCM CITY ATTRACTS US$5.7 BILLION INTO EXPORT PROCESSING AND INDUSTRIAL ZONES
HCM City attracted US$5.7 billion in domestic and foreign investment into its export processing and industrial zones during the first nine months of 2026. The figure exceeded the city's full-year target by 31 per cent, highlighting strong momentum in high-quality industrial investment under Resolution No.10-NQ/TW. Total investment reached 131 per cent of the 2026 target of $4.25 billion and represented a 29 per cent increase compared with the same period in 2025, according to the city's Export Processing and Industrial Zones Authority (HEPZA).
DONG THAP PROVINCE STEPS UP INDUSTRIAL EXPANSION AND INFRASTRUCTURE CONNECTIVITY
Accelerating public investment, strengthening inter-regional connectivity, and expanding industrial land are helping Dong Thap efficiently bolster competitiveness and drive economic growth. Following the 2025 merger of the former Dong Thap and Tien Giang provinces, the expanded Dong Thap province in the Mekong Delta faces mounting pressure to accelerate infrastructure development and strengthen connectivity among local economic zones, urban areas, industrial parks (IPs), and production centres.






















